top of page

field2

DSC_0195

DSC_0001

field2
1/5
ALUMNI FIELD
Construction of Alumni Field began in May of 2011, and the field was dedicated on the 12th of October in the same year. With its own well and irrigation system Alumni Field’s 120 yard long and 75 yard wide playing surface provides the Vikings with a second on campus field for its teams.
bottom of page